NEWSLETTER Subscribe to our e-list and we will keep you informed about news, competitions and campaigns

Bussines zone

Business zone West

MUNICIPALITY / CITY: CITY OF ČAZMA CONTACT: City of Čazma Trg Čazmanskog kaptola 13, 43240 Čazma Phone: + 385 43 771 052 Fax: + 385 43 771 056 E-mail: grad.cazma@bj.t-com.hr   SURFACE OF THE ZONE(ha) a) WITH ROADS AND PUBLIC AREAS b)  SURFACE OF THE CONSTRUCTION PARCEL 26,3 ha  AVAILABLE FOR SALE (ha) 12,7 ha STRUCTURE OF OWNERSHIP Municipality/city ha / % RH ha / % Private ha / % 1,1 ha 11,6 ha 13,6 ha SPATIAL PLAN Official Gazette No. In the preparation Spatial Plan of the City of Čazma, "Official Journal“ No. 28/03, 19/06, 30/11 and 18/12 URBANISTIC PLAN Official Gazette No. Not required In the preparation Urban development plan "Cazma West", "Official Journal" No. 30/07 DETAILED PLAN Official Gazette No. Not required In the preparation Not required POSSIBLE ACTIVITIES Economic purpose - production, craft, business, commercial, offices, research centers, technology parks and tourism, etc... T1, T2, T3 Production - industrial production, craft production Service - service and commercial use CURRENT ACTIVITIES IN THE ZONE Company for the transportation of passengers in domestic and foreign transport, technical inspection of motor vehicles, production of electric equipment NUMBER OF ENTERPRENEURS IN THE ZONE Key economic factors nearby 0 COMMUNAL INFRASTRUCTURE (in the zone/in construction/description) In the entire zone is fully performed. WATER INSTALLATIONS (yes - Diameter mm/no), description Yes POWER NETWORK (available power), description. Yes SEWERAGE SYSTEM Yes TELEPHONE Yes GAS Yes TRAFFIC / DESCRIPTIVE Direct connection to the DC-43 COMMENT ON THE POSSIBILITIES OF THE ZONE (in terms of infrastructure, ownership, location plan) Construction possible through direct implementation of the Spatial Plan of the City and Urban Plan of the City. Price of vacant parcels owned by the city of Čazma and legal entities is 25kn/m2. Parcels owned by private persons are not for sale. STRATEGIC POSITION description-traffic connections name and distance (in miles) to the nearest urban center + graphical representation City of Čazma is located in the north western part of the Croatia in Bjelovar – Bilogora County. It is only 60 km away from Zagreb and 30 km from the center of the region - Bjelovar. From the highway Zagreb - Lipovac zone is distanced 19 km, from the railway line Zagreb-Belgrade 19 km. City of Čazma has a population of 9000 inhabitants, mostly in the 36 suburbs. Business zone West is located in the western part of the city of Čazma with access from the main road D 43, street F. Vidović.
Bussines zone: Čazma + read more

Business zone West 1

MUNICIPALITY / CITY: CITY OF DARUVAR CONTACT: City of Daruvar Economy department - construction, urban planning and public utilities Phone: 00385 43/331-241 Fax: 00385 43/331-285 E-mail: grad-gospodarstvo@daruvar.h, ivana.juric@daruvar.hr   SURFACE OF THE ZONE (ha) a) WITH ROADS AND PUBLIC AREAS b)  SURFACE OF THE CONSTRUCTION PARCEL 3,17 ha 2,9 ha AVAILABLE FOR SALE (ha) 0 STRUCTURE OF OWNERSHIP Municipality/city ha / % RH ha / % Private ha / % 100 % City of Daruvar SPATIAL PLAN Official Gazette No. In the preparation „Official Gazette of City of Daruvar“, No. 8/04 and 7/10 URBANISTIC PLAN Official Gazette No. Not required In the preparation „Official Gazette of City of Daruvar“, No. 8/04, and 5/12 DETAILED PLAN Official Gazette No. Not required In the preparation Not required POSSIBLE ACTIVITIES Economic purpose - production, craft, business, commercial, offices, research centers, technology parks and tourism, etc... T1, T2, T3 Production activities CURRENT ACTIVITIES IN THE ZONE Production of hydraulic components and other mechanical parts, furniture manufacturing, production of PVC, production of packaging material, production and processing of honey and other bee products, pasta production NUMBER OF ENTERPRENEURS IN THE ZONE Key economic factors nearby 9 entrepreneurs, of which 6 operates. On one parcel works were stopped due to lack of financial resources, for 2 is in the making the project documentation. COMMUNAL INFRASTRUCTURE (in the zone/in construction/description) Built in the zone WATER INSTALLATIONS (yes - Diameter mm/no), description Yes, water supply network is built, Ø 100 mm POWER NETWORK (available power), description. Available power of 301 kW. Derived public lighting. SEWERAGE SYSTEM Yes, constructed sewerage system, Ø 500 mm TELEPHONE DA, DTI derived GAS YES - constructed gas network TRAFFIC / DESCRIPTIVE YES, built asphalt pavement, connected to the street Jelacic COMMENT ON THE POSSIBILITIES OF THE ZONE (in terms of infrastructure, ownership, location plan) In the Zone there are no parcels for sale. STRATEGIC POSITION description-traffic connections name and distance (in miles) to the nearest urban center + graphical representation Business zone West 1 is located 125 km from Zagreb, 50 km away from the highway, 150 km from the airport, 300 km from the sea port and 90 km from the river port. City of Daruvar has a population of 11,612 (2011), and is the second largest city in the county. Daruvar is also tourist center of Bjelovar-Bilogora County.
Bussines zone: Daruvar + read more

Business zone West 2

MUNICIPALITY / CITY: CITY OF DARUVAR CONTACT: City of Daruvar Economy department - construction, urban planning and public utilities Phone: 00385 43/331-241 Fax: 00385 43/331-285 E-mail: grad-gospodarstvo@daruvar.h, ivana.juric@daruvar.hr   SURFACE OF THE ZONE (ha) a) WITH ROADS AND PUBLIC AREAS b)  SURFACE OF THE CONSTRUCTION PARCEL 1,915 ha 1,754 ha AVAILABLE FOR SALE (ha) 1,565 ha STRUCTURE OF OWNERSHIP Municipality/city ha / % RH ha / % Private ha / % 100% City SPATIAL PLAN Official Gazette No. In the preparation „Official Gazette of City of Daruvar“, No. 8/04 and 7/10 URBANISTIC PLAN Official Gazette No. Not required In the preparation „Official Gazette of City of Daruvar“, No. 8/04 and 5/12 DETAILED PLAN Official Gazette No. Not required In the preparation Not required POSSIBLE ACTIVITIES Economic purpose - production, craft, business, commercial, offices, research centers, technology parks and tourism, etc... T1, T2, T3 Combined zone CURRENT ACTIVITIES IN THE ZONE Manufacture of other knitted and crocheted goods NUMBER OF ENTERPRENEURS IN THE ZONE Key economic factors nearby 1 entrepreneur operates, 7 parcels is free for sale. In the zone are employed 44 people. COMMUNAL INFRASTRUCTURE (in the zone/in construction/description) In construction, only existing building in the area (former military barracks) is connected to the infrastructure. WATER INSTALLATIONS (yes - Diameter mm/no), description In preparation, pressure pipes for drinking water of HDPE Ø 80, external hydrant POWER NETWORK (available power), description. It will be built TS 10 (20)/04 kV "ZRINSKI 2", belonging 10 (20) kV underground transmission line. Supply power 180,32 kW, power by parcels 25,76 Kw. SEWERAGE SYSTEM HDPE Ø 250, HDPE Ø 300 TELEPHONE It will be performed GAS Gas network will be built. TRAFFIC / DESCRIPTIVE In construction - asphalt pavement COMMENT ON THE POSSIBILITIES OF THE ZONE (in terms of infrastructure, ownership, location plan) 7 parcels are free for sale. The infrastructure is being built. By the end of 2012 the zone will be equipped with complete infrastructure. STRATEGIC POSITION description-traffic connections name and distance (in miles) to the nearest urban center + graphical representation Business zone West 2 is located 125 km from Zagreb, 50 km away from the highway, 150 km from the airport, 300 km from the sea port and 90 km from the river port. City of Daruvar has a population of 11,612 (2011), and is the second largest city in the county. Daruvar is also tourist center of Bjelovar-Bilogora County.
Bussines zone: Daruvar + read more

Zone of small and medium entrepreneurship I

MUNICIPALITY / CITY: CITY OF GRUBIŠNO POLJE CONTACT: Department of economy Trg b.J.Jelačića 1, 43290 Grubišno Polje Phone/fax: +385 43 448201/ +385 43 485496 E-mail: gospodarstvo@grubisnopolje.hr   SURFACE OF THE ZONE (ha) a) WITH ROADS AND PUBLIC AREAS b)  SURFACE OF THE CONSTRUCTION PARCEL a) 13,75 ha b) 12,64 ha AVAILABLE FOR SALE (ha) 0 ha STRUCTURE OF OWNERSHIP Municipality/city ha / % RH ha / % Private ha / % City: 1,11 ha / 8% (road with public area) Private: 12,64 ha / 92% SPATIAL PLAN Official Gazette No. In the preparation „Official Gazette" of the City of Grubišno Polje 14/05 i 3/06 URBANISTIC PLAN Official Gazette No. Not required In the preparation Not required DETAILED PLAN Official Gazette No. Not required In the preparation Not required POSSIBLE ACTIVITIES Economic purpose - production, craft, business, commercial, offices, research centers, technology parks and tourism, etc ... T1, T2, T3 Economic purpose - production, craft, business, offices CURRENT ACTIVITIES IN THE ZONE - manufacture of metal products, - collection, storage and treatment of hazardous waste, - production of asphalt, concrete and other building products, - manufacture of wood (except furniture), - service utilities, recycling, construction, repair of motor vehicles NUMBER OF ENTERPRENEURS IN THE ZONE Key economic factors nearby 5 entrepreneurs - all are operating and have 79 employees. COMMUNAL INFRASTRUCTURE (in the zone/in construction/description) Yes - the infrastructure has been built in accordance with the needs of businesses that operating in the zone. WATER INSTALLATIONS (yes - Diameter mm/no), description Yes - built for the zone: Φ 110 mm hydrant network POWER NETWORK (available power), description. Yes - all entrepreneurs in the zone have sufficient electrical power SEWERAGE SYSTEM Yes - Φ 300 mm, announced a public tender for the construction of a waste water treatment plant for the entire zone. TELEPHONE Yes - DTK performed for the business zone. GAS Yes - built gas network for zone. TRAFFIC / DESCRIPTIVE Yes - built asphalt pavement which is connected to a county road 3004 (Grubišno Polje - Veliki Grđevac) COMMENT ON THE POSSIBILITIES OF THE ZONE (in terms of infrastructure, ownership, location plan) All the required spatial plans are adopted, on the built infrastructure are connected all entrepreneurs who are operating in the zone. All building parcels are sold, built and in function. So in this area there is no possibility to accept new investors. STRATEGIC POSITION description-traffic connections name and distance (in miles) to the nearest urban center + graphical representation Zone I SME Grubisno Polje is located 120 km from Zagreb, between Bjelovar (40 km), Virovitica (28 km), Daruvar (21 km) and Garesnica (25 km) along the county road Grubisno Polje - Veliki Grdjevac - Bjelovar, 1 km away from the national road linking to the D5 motorway in Kutina (45 km), from Garešnica, Grubišno Polje, Virovitica and the Republic of Hungary (border crossing Terezino Polje 40 km away. Highway distance is 45 km (Kutina), ti the highway 70 km (Cugovec in Vrbovac), to the railroad station is 28 km (Virovitica) and 40 km (Bjelovar), Airport 130 km (Zagreb-Pleso).
Bussines zone: Grubišno polje + read more

Zone of small and medium entrepreneurship II

MUNICIPALITY / CITY: CITY OF GRUBIŠNO POLJE CONTACT: Department of economy Trg b.J.Jelačića 1, 43290 Grubišno Polje Phone/fax: +385 43 448201/ +385 43 485496 E-mail: gospodarstvo@grubisnopolje.hr   SURFACE OF THE ZONE (ha) a) WITH ROADS AND PUBLIC AREAS b)  SURFACE OF THE CONSTRUCTION PARCEL a) 13,84 ha b) 11,84 ha AVAILABLE FOR SALE (ha) 0 ha STRUCTURE OF OWNERSHIP Municipality/city ha / % RH ha / % Private ha / % City: 2 ha / 14% (road with public area) Private: 11,84 ha / 86% SPATIAL PLAN Official Gazette No. In the preparation „Official Gazette" of the City of Grubišno Polje 14/05 and 3/06 URBANISTIC PLAN Official Gazette No. Not required In the preparation „Official Gazette" of the City of Grubišno Polje 5/08 DETAILED PLAN Official Gazette No. Not required In the preparation Not required POSSIBLE ACTIVITIES Economic purpose - production, craft, business, commercial, offices, research centers, technology parks and tourism, etc ... T1, T2, T3 Economic purpose - production, craft, business, offices CURRENT ACTIVITIES IN THE ZONE Planned activities: - Production of wood products (furniture), - Production of electricity and thermal energy to the OIE (cogeneration plants on forest biomass and biogas), - Manufacture of wood and products of wood (sawmill), - Manufacture of metal products. NUMBER OF ENTERPRENEURS IN THE ZONE Key economic factors nearby 6 entrepreneurs - one of which is under construction, and the other 5 in the phase of technical project documentation (3 entrepreneurs have obtained building permits) COMMUNAL INFRASTRUCTURE (in the zone/in construction/description) Yes - The infrastructure has been built in accordance with the needs of entrepreneurs who are operating in the zone. WATER INSTALLATIONS (yes - Diameter mm/no), description Yes - plumbing is built for the zone: Φ 110 mm hydrant network POWER NETWORK (available power), description. Yes - built power station with 800 kW of power connectors engaged on the electricity, of which is still available 400 kW. SEWERAGE SYSTEM Yes - Φ 300 mm and announced a public tender for the construction of a waste water treatment plant for the entire zone. TELEPHONE Yes - DTI derived for the business zone. GAS Yes - built gas network for the zone. TRAFFIC / DESCRIPTIVE Yes - built asphalt pavement  which is connected to the area and with small and medium enterprises on the county road 3004 (Grubisno Polje - Veliki Grđevac) COMMENT ON THE POSSIBILITIES OF THE ZONE (in terms of infrastructure, ownership, location plan) All the required spatial plans are adopted, on the built infrastructure can be connected all the entrepreneurs who are building facilities in the zone. All building parcels are sold. Starting price for the production activity was 2 msup>2, trade and warehouse space 80 kn/m2. All parcels were sold at a subsidized price in favor of the City of Grubišno Polje. In the zone is planned employment of 62 employees. So in this zone is currently no possibility to accept new investors if some of the existing investors will not give up his project. STRATEGIC POSITION description-traffic connections name and distance (in miles) to the nearest urban center + graphical representation Zone II SME Grubisno Polje abuts on the Zone I, and is located 120 km from Zagreb, between Bjelovar (40 km), Virovitica (28 km), Daruvar (21 km) and Garesnica (25 km) along the county road Grubisno Polje - Veliki Grđevac - Bjelovar, only 1 km away from the national road linking the D5 motorway in Kutina (45 km) from Garešnica, Grubišno Polje, Virovitica and the Republic of Hungary (border crossing Terezino Polje, 40 km away). Highway distance is 45 km (Kutina), and by the highway 70 km (Cugovec in Vrbovac), then to the station is 28 km (Virovitica) and 40 km (Bjelovar), Airport 130 km (Zagreb-Pleso).
Bussines zone: Grubišno polje + read more

Zone of small and medium entrepreneurship III

MUNICIPALITY / CITY: CITY OF GRUBIŠNO POLJE CONTACT: Department of economy Trg b.J.Jelačića 1, 43290 Grubišno Polje Phone/fax: +385 43 448201/ +385 43 485496 E-mail: gospodarstvo@grubisnopolje.hr   SURFACE OF THE ZONE (ha) a) WITH ROADS AND PUBLIC AREAS b) SURFACE OF THE CONSTRUCTION PLOT a) 52 ha b) 45 ha (in the plan) FREE FOR SALE 45 ha STRUCTURE OF OWNERSHIP Municipality/city ha / % RH ha / % Private ha / % City: 100% SPATIAL PLAN Official Gazette No. In the preparation „Official Gazette" of the City of Grubišno Polje 14/05, 3/06 and 5/11 URBANISTIC PLAN Official Gazette No. Not required In the preparation In preparation (to be finalized and adopted by the end of 2012.) DETAILED PLAN Official Gazette No. Not required In the preparation Not required POSSIBLE ACTIVITIES Economic purpose - production, craft, business, commercial, offices, research centers, technology parks and tourism, etc ... T1, T2, T3 Economic purpose - production, craft, business, offices, agriculture (greenhouses), tourism, etc. CURRENT ACTIVITIES IN THE ZONE - NUMBER OF ENTERPRENEURS IN THE ZONE Key economic factors nearby - COMMUNAL INFRASTRUCTURE (in the zone/in construction/description) No - in process is preliminary design and final design for communal infrastructure that needs to be done after the adoption of the UPU for Zone III of SMEs. WATER INSTALLATIONS (yes - Diameter mm/no), description No POWER NETWORK (available power), description. No SEWERAGE SYSTEM No TELEPHONE No GAS No TRAFFIC / DESCRIPTIVE No COMMENT ON THE POSSIBILITIES OF THE ZONE (in terms of infrastructure, ownership, location plan) Drafted and adopted Regional Plan. It is also near completion feasibility studies of Zone III of small and medium enterprises. Early next year will be made parcelling and will go on sale the first parcels. Part of the zone (approximately 7 hectares) will be provided for the tourism industry because it is located next to an existing pond that is planned to extend, second part of parcels will be provided for agricultural production (greenhouses, approx. 10-15ha) because from cogeneration plants that are being built in the Zone II will be favorable thermal energy, and the other part will be provided mainly for production purposes (approximately 14 plots of 20 to 25 ha). The land is 100% owned by the City of Grubišno Polje. Zone III is divided into two parts, the northern (area 12 ha), which leans north on the Zone I and II and western (area of 40 ha), which builds on the west zone II SME Grubisno Polje. STRATEGIC POSITION description - traffic connections name and distance (in miles) to the nearest urban center, population + graphical representation Zone III SME Grubisno Polje abuts on the Zone I and II and is 120 km from Zagreb, between Bjelovar (40 km), Virovitica (28 km), Daruvar (21 km) and Garesnica (25 km), to the county road Grubisno Polje - Veliki Grđevac - Bjelovar, only 1 km away from the national road linking the D5 motorway in Kutina (45 km) from Garešnica, Grubišno Polje, Virovitica and the Republic of Hungary (border crossing Terezino Polje 40 km away). Highway distance is 45 km (Kutina), and to the highway 70 km (Cugovec in Vrbovac), then to the railway station 28 km (Virovitica) and 40 km (Bjelovar), Airport 130 km (Zagreb-Pleso).
Bussines zone: Grubišno polje + read more

Business zone Kapelica

MUNICIPALITY / CITY: CITY OF GAREŠNICA CONTACT: City of Garešnica Vladimira Nazora 22, 43280 Garešnica Tel.: 00385/43/531-011 Fax: 00385/43/531-568 E-mail: grad@garesnica.net – Tomislav Anđal Development agency of Bjelovar-Bilogora County A. Starčevića 8, 43000 Bjelovar Tel.: 00385/43/225-993 Fax: 00385/43/225-998 E-mail: info@rerabbz.hr – Marinko Bartulović   SURFACE OF THE ZONE (ha) a) WITH ROADS AND PUBLIC AREAS b) SURFACE OF THE CONSTRUCTION PLOT 22,5 ha 19 ha FREE FOR SALE cca 19 ha STRUCTURE OF OWNERSHIP Municipality/city ha / % RH ha / % Private ha / % 85 % - City of Garešnica 15 % - private SPATIAL PLAN Official Gazette No. In the preparation "Official Gazette of the City of Garešnica", No. 08/03 URBANISTIC PLAN Official Gazette No. Not required In the preparation Urban development plan in the preparation (in the final phase of adoption - the end of September 2012.) DETAILED PLAN Official Gazette No. Not required In the preparation Not required POSSIBLE ACTIVITIES Economic purpose - production, craft, business, commercial, offices, research centers, technology parks and tourism, etc ... T1, T2, T3 All business, production, trade, research and technological activities, especially energy (RES); offices, restaurants (motel and restaurant.) CURRENT ACTIVITIES IN THE ZONE No NUMBER OF ENTERPRENEURS IN THE ZONE Key economic factors nearby No COMMUNAL INFRASTRUCTURE (in the zone/in construction/description) No WATER INSTALLATIONS (yes - Diameter mm/no), description No POWER NETWORK (available power), description. No SEWERAGE SYSTEM No TELEPHONE No GAS No TRAFFIC / DESCRIPTIVE No (only macadam road - about 400 meters) COMMENT ON THE POSSIBILITIES OF THE ZONE (in terms of infrastructure, ownership, location plan) - Spatial Plan of the City of Garešnica is enacted - The draft of the urbanistic plan of the zone - Most of the area is owned by the City of Garešnica - Equipping zone with communal infrastructure is in progress (conceptual design and detailed design) STRATEGIC POSITION description - traffic connections name and distance (in miles) to the nearest urban center, population + graphical representation - about 90 km away from Zagreb - 17 km away from the highway Zagreb - Lipovac - 25 km from Daruvar - planned highway passes near the zone (direction: Kutina - Garešnica - Daruvar - Virovitica) - 20 km on the state road to the planned new highway Virovitica - Bjelovar - Zagreb - The zone is located in a suburban area of the City of Garešnica, urban center, with about 4000 inhabitants
Bussines zone: Garešnica + read more

Industrial zone Doljani

MUNICIPALITY / CITY: MUNICIPALITY OF ŠANDROVAC CONTACT: Municipality of Šandrovac Bjelovarska 6, 43 227 Šandrovac Tel.: 00385/43/874-128 Fax: 00385/43/874-366 E-mail: info@sandrovac.hr   SURFACE OF THE ZONE (ha) a) WITH ROADS AND PUBLIC AREAS b) SURFACE OF THE CONSTRUCTION PLOT  cca 5,6 ha (55949 m2) FREE FOR SALE 5 ha STRUCTURE OF OWNERSHIP Municipality/city ha / % RH ha / % Private ha / % Municipality of Šandrovac 100% SPATIAL PLAN Official Gazette No. In the preparation „Municipal Bulletin of Šandrovac“ No. 23/05 URBANISTIC PLAN Official Gazette No. Not required In the preparation Not required DETAILED PLAN Official Gazette No. Not required In the preparation Not required POSSIBLE ACTIVITIES Economic purpose - production, craft, business, commercial, offices, research centers, technology parks and tourism, etc ... T1, T2, T3 Purpose of the future business zone, or activities that will be carried out in her framework are production-service-storage activities, and exact function will be defined when the owners of parcels will be known. In accordance with the spatial plan and preliminary plan it is planned subdivision of land on 6 parcels, and according to investor demand one parcel area of approx. 60 m2, which is intended for the construction of the substation. CURRENT ACTIVITIES IN THE ZONE There is no existing activities in the area. NUMBER OF ENTERPRENEURS IN THE ZONE Key economic factors nearby Proximity of the City of Bjelovar and Đurđevac, companies Metalprodukt Šandrovac, oil wells and INA d.d. COMMUNAL INFRASTRUCTURE (in the zone/in construction/description) Road Šandrovac - Pupelica, from which is planned entrance to individual parcels, passes water, telephone and gas networks. By the end of 2012 it is planned construction of the substation. WATER INSTALLATIONS (yes - Diameter mm/no), description Along the road Šandrovac - Pupelica is derived water supply network with HDPE pipes dimensions D160. Each prospective user of water supply network needs to obtain conditions from the distributors according to their needs. POWER NETWORK (available power), description. Over the land of business zone passes above ground 10 kV transmission line. A new power network should ensure supply of electricity to all customers of business zone. In order to achieve this in a commercial zone will be built a new substation 10 (20) / 0.4 kV, which will be interpolated into the existing high voltage distribution. All electrical power distribution will be carried out underground. Low voltage power distribution will provide, any business entity within the zone safe, stable and continuous power supply. It is designed for low voltage distribution power so that the new substation 10 (20) / 0.4 kV located in the center of the zone on a separate parcel, with underground cables, PPOO-A 4x150mm2, connect SSPMO on each individual parcel. This would ensure to all future users connection to the LV distribution network and quality supply of electricity that needs to be presented in the main project for the construction of a building in a separate proceeding. SEWERAGE SYSTEM Drainage of storm water will be solved directly by its own ground, waste and faecal waters will be solved in a mini sewer treatment plant sanitary sewage (biorotor etc.) with controlled discharge into the channel at the back of the parcel. Capacity of the wastewater treatment plants of sanitary-sewage water should be determined in the main project for each parcel. TELEPHONE Each parcel in the economic zone has the ability to connect to tele-communication system. Joining subscribers will be performed in an underground cable connection box that will be made in the most suitable façade wall of future commercial buildings at a height of approx. 1 m from the ground level. GAS Along the road Šandrovac-Pupelica is derived pipeline HDPE pipe dimensions d110 and 3 bar pressure that will connect consumers and business facilities. Each prospective user gas network needs to obtain the conditions for the connection of gas distributor according to their needs. TRAFFIC / DESCRIPTIVE For the functioning of the business zone is necessary to organize traffic. It is necessary to take the following procedures: 1. provide access from individual parcels of the Zone to the road Šandrovac-Pupelica 2. considering that business zone is predominantly productive purposes, where it is planned to increase transport of vehicles for the diversion from the road Šandrovac-Pupelica which is approx. 5 m width, gates are planned to be constructed at a minimum width of 10 m with a radius of connecting to a public road of 6 m. COMMENT ON THE POSSIBILITIES OF THE ZONE (in terms of infrastructure, ownership, location plan) All the required spatial plans are enacted. The land is owned by the Municipality of Šandrovac, tenders for sale are not open. Until the end of 2012 it is planned construction of the power station.
Bussines zone: Šandrovac + read more
 
 < 1 2 3 > 

Bussines zone

MENU

Archives ARCHIVES
EVENTS - Mar 2021
M T W T F S S
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
0
0
0
0